NS Batam YardCurrent ProjectSouth MahakamThe three tripods are to be installed into the East Stupa, West Stupa and East Manda oil fields. Through the 14 kilometers of 24-inch and 12-inch interpolator pipelines the tripods will be linked. A 24-inch, 80-kilometre pipeline will export the outputs from the three fields.The fabrication and installation job is likely to occur from 2010 resulting the
No comments:
Post a Comment